FAQs - Engineering
How do I apply for a driveway access permit or a right-of-way construction permit?
Applications for a driveway access permit or a right-of-way construction permit are available from the La Plata County Engineering Department, 1060 Main Avenue, Suite 104, Durango. Or you may call 970-382-6372 and we will be happy to mail you the appropriate form. Depending on your circumstances, you may be required to have an access permit in order to obtain a building permit. Read more »
How much does the driveway access permit cost?
The fee for an access permit is $100.00.
How can I expedite the approval process for an access permit?
Accurate information is what is most needed for your permit to be quickly processed. Filling out the application form as completely as possible, giving accurate directions and attaching a sketch plan of your proposed access will be extremely helpful. Clearly mark your proposed access location in the field with the marking tape provided by the engineering department. Keep in mind that although you know where your property and proposed access are, we don't. Read more »
What specific permit is required for construction activities within the county right-of-way?
For construction activities within the county right-of-way, you will need one of the following:
Utility Installation
If you are going to be installing, performing maintenance on, or repairing any public or private utility located within the La Plata County Right of Way, you will need to obtain a Utility Permit. You should apply for the permit at least 14 working days prior to the expected start date of your project. You may be required to submit a Traffic Control Plan prepared by a certified Traffic Control Supervisor as well as a set of plans for your project. Read more »
Special Transport Permit - What information is needed before a Special Transport Permit can be used?
Information on the transport vehicle is necessary, i.e. license number, vin number, make and year. Information from the mobile home that is needed is the year, model, vin number, width and length. Also where the home is coming from and going to is required along with the date and route to be taken.
Do I need any additional permits to move a mobile home on County roads?
Yes a Special Transport Permit is required if the mobile home is over 81/2 feet in width.
Can I build the driveway access myself?
Yes. However, the bonding requirement mentioned above applies to work done by the property owner as well as work done by a contractor.
How long is an access permit good for and how can I get an extension?
A permit is good for thirty (30) days. A brief call to the Engineering Department will usually be sufficient to get an extension. However, if you haven't begun construction on your access and your permit is expired, without an extension granted, a new permit will be required. Read more »
What other permits may be required in regards to excavation within the right-of-way?
Special Transport Permits (oversize/overweight vehicles) are required whenever a vehicle exceeds to load limits for the county roads. Read more »
Locate Utility Lines - Who do I call to have my utility lines marked?
Utility Notification Center of Colorado
If you are planning a home improvement, planting a tree, digging a fence CALL 811 BEFORE YOU DIG. Have your underground utility lines marked for free and prevent undesired consequences.